Building Network Operators

The BNO is responsible for the distribution board’s installation and cables between that and the individual properties.

What is a Building Network Operator?

A Building Network Operator (BNO) is defined as “an organization that owns or operates the electricity distribution network within a multiple occupancy building between the intake position and the customer installation”.

The services that a BNO provides range from providing and wiring of CTs (Current Transformers) to energisation of the first point of isolation on LV systems.

What can a Building Network Operator do?

They install CT cabinets and are also fully licensed Meter Operators. Their particular set of skills eliminates the complexities of having to manage multiple suppliers who may have conflicting availability.

With the help of a BNO, it is achievable to converge the connection and energisation activities into just one day. They can provide and install the CT Chamber, connect and commission your CTs in line with Elexon P283 requirements and install your meters on the same day.

Arranging a BNO through The Energy Desk can remove weeks from your connection and energisation timetable.

How does this affect my project?

This will impact many new build and renovation projects of flats, office buildings and any other buildings that share a common intake service.

The Distribution Network Operator will not be responsible for the risers and laterals to multi-occupied buildings. The electrical contractor will need to install their own electrical connections within any building.

Challenging areas can be the installation and wiring of CT Panels and the P283 commission test that is required by both the Energy Supplier and the Meter Operator.

Connection and secondary wiring of CTs and incorrect tail size can lead to delays in meters being installed, a delay in the energisation of the building by the Meter Operator/Distribution Network Operator and can impact the whole project.

Specifications

The Meter Operator will install the meters and connect tails upon installation and complete secondary wiring of the CTs in the panel on the same visit.Below are the space requirements for the installed CT panel.

Requirements

In order to be as efficient as possible and to complete the installation on the first visit we would advise that there is adequate space and suitable tails that have been provided by the site electrician.

Below is a table to assist in the correct sizing of the tails.

How can The Energy Desk help you?

Our partners offer a standard time of ten working days for BNO panel installation and Meter Operator services. However, we understand that projects can change at a moment’s notice so we do offer flexibility for short notice appointments.

For more information about Building Network Operators or any other advice about utility procurement services contact the TED team on 0845 838 9830. Alternatively, you can contact a specialist and request a call back at a time to suit you.

How TED can help
01

SEND TED A LETTER OF AUTHORITY

Firstly, send The Energy Desk a Letter of Authority which states that we can contact suppliers on behalf of your business. We are unable to act until we have received this letter.

02

SEND DETAILS OF YOUR PROJECT

Once we have received the Letter of Authority, submit the specific details of your project so that The Energy Desk can determine the best course of action.

03

TED WILL GATHER NECESSARY DATA

The Energy Desk will collate the necessary data we need in order to provide an informed solution that best suits your requirements.

04

CHOOSE THE BEST QUOTE TO SUIT YOU

The Energy Desk are committed to ensuring that you get the best price possible. We work hard to make sure you’re happy with the price.

05

TED WILL REGISTER YOUR SUPPLY

To be able to use your new energy supply you will require the appropriate supply contracts, your service meter point reference number registered and suitable metering equipment installed.

06

YOUR METER WILL BE INSTALLED

TED has a network of approved meter installers to make sure the process runs as it should. We can guide you through any installation processes you may need to complete.

Get in touch

Find out how TED can save you money on your energy bills.

Error: LeadForm Cannot Be Displayed on this device
CTA 1
CTA 1
CTA 1
Ask TED
Talk to TED
Call Me Back

 

Building Network Operators
2016-07-12T13:28:09+00:00
The Energy Desk