KVA Management

The Available Supply Capacity (ASC) refers to the amount of electricity that the Distribution Network Operator (DNO) is required to make available for your site. Essentially, it is the maximum electricity you can draw from the grid at any one moment.

What does Available Supply Capacity mean?

Available Supply Capacity is measured in Kilo Volt Amperes (kVa), and for half-hourly metered sites is charged on a monthly basis as a standing charge. Any site with a requirement of 100 kVa should be half-hourly metered.

Reducing your Available Supply Capacity

Distribution costs make up between 25-30% of overall electricity costs. They are often pass through costs invoiced by your Electricity Supplier and depend on the location and size of the site as well as the Available Supply Capacity.

Sometimes when you move into a site, you may be paying for more capacity than you need as this is what was agreed with the previous tenant.
With Capacity Matching Projects from TED, ensuring the electricity connection arrangements with your distributor are appropriate for your requirements can result in significant cost savings.


Increasing your Available Supply Capacity

On the other side of the coin is the need to increase your kVa. Companies often make the mistake of purchasing new machinery or equipment without ensuring they have enough available capacity to cover it. Commonly this happens with new air conditioning systems, or factory machinery.

If you significantly increase the amount of power you draw from the grid you should always make sure your kVa allowance has been arranged in advance with your network operator; or you will most likely be charged excess capacity charges by your DNO.
To find out more about our new connection services and how we can help your business to make significant savings please contact us today!

How TED can help
01

Send TED a Letter of Authority

A Letter of Authority allows us to act on your behalf

02

Submit details of the project

This includes a site outline, a definition of the requirements (including the desired date for connection) and MPAN or MPR for new point of connection

03

TED collates and tenders

We will collate the data and tender your requirements to market

04

Choose a quote

We will present the list of quotes to you for you to choose from, after which you will need to send the appropriate paperwork to us

05

Supply registered

Your supplier will register the supply and provide a date for meter install

06

Meter installed

The meter is installed and the supply goes live!

Get in touch

Find out how TED can save you money on your energy bills.

Error: LeadForm Cannot Be Displayed on this device
CTA 1
CTA 1
CTA 1
Ask TED
Talk to TED
Call Me Back

 

KVA Management
2014-08-18T14:05:09+00:00
The Energy Desk