Dual CHP deployment saving over £452,800 with zero capital cost to the 5-star heritage hotel and spa.
Built in 1791, Seaham Hall is one of the finest 5-star Hotel and Spa facilities in the North East of England, boasting luxurious surroundings and the award-winning Serenity Spa. As a large hospitality site with multiple services, there are significantly high demands on heat and power to continuously provide for guests.
When Seaham Hall contacted TED for assistance with their sustainability and energy procurement, we identified a unique challenge: the site is essentially divided into two distinct buildings. The hotel and the spa each have their own utility infrastructure, individual in-coming mains electricity (MPANs), separate gas main connections, and distinct heating loads.
The task ahead required careful thought and planning to deliver a solution that met their high energy demands without disrupting the 5-star guest experience or the 1791 heritage aesthetic.
Following a full energy review, our partners at TED Generation calculated the feasibility of installing a Combined Heat and Power (CHP) system. Because the hotel and spa have separate utility infrastructures, this enabled TED to look at both sides on an individual basis with tailored proposals.
Based on half-hourly electrical grid data, we proposed and installed a 100KW CHP unit at the hotel and a second 100KW CHP unit at the spa. To comply with the strict aesthetic requirements of the 5-star historic surroundings, we designed two bespoke enclosures. TED Generation covered the full capital cost of the installation, enclosures, and ongoing maintenance through the life of the agreement.





"Both the spa and the hotel started receiving heat and power at a guaranteed discount rate against the prevailing rates on the grid, with immediate Day 1 savings."
TED Generation Project Report
£452,800
Total lifetime savings across the Hotel (£191.9k) and Spa (£260.9k).
350 tonnes
CO₂ reduced annually (143 tonnes Hotel + 207 tonnes Spa).
£34,500
Combined Year 1 direct savings for the estate.
£0
Capital cost to the client for equipment, enclosures, and maintenance.
More success stories
Discover how TED saved Michels and Taylor money on their MOP/DCDA agreements.
TRUSTED BY
Operations Director
Multi-Site Manufacturing Client
Speak to a consultant today. No jargon. No obligation.
10 Venus House, Mercury Rise,
Altham Industrial Estate,
Accrington, Lancashire, BB5 5BY